My parents and Uncle Paul and Aunt Carol came up on Thursday night and we worked all day Friday and Saturday. Having my uncle and aunt here was a great surprise and helped us feel that our project might get done on time yet! Jameson and my dad focused on the ceiling both days and got the rec room, kitchen/family room, and bedroom all done. Paul installed the sinks in the kitchen and bathroom, completed the related plumbing work, and finished the plumbing for the shower. He also put in all the light switches and outlets, but up the bathroom lights, and put up the upper kitchen cabinets. Carol cleaned out all the compound from the kitchen tiles so it's ready for grout, put up light switch and outlet covers and helped with other misc things and cleaning. My mom painted the bedroom closet, the ceiling/walls in the stairway, more trim, and more. As usual, I helped out where needed, made necessary trips to get materials, and prepared meals.
It was a VERY productive weekend. At the end of the day Saturday, some trim work for around the windows even got started!
Jameson and Dad putting up the ceiling.
Rec room- have the ceiling done makes a BIG difference!
Kitchen cabinets and sink installed.
Bathroom vanity, sink, mirror, and lights installed.